
Lecture 47 of 60 · Ventilation and Climate Control
Paluchamy B
Ventilation and Climate Control · 60 lectures
60 lectures
1: The Subsurface Environment and the Need For Ventilation
2: Mine Gases: Properties and Hazards
3: Gas Emission and Management
4: Mine Dust Characteristics and Health Hazards
5: Airborne Dust Measurement and Control
6: Introduction to Psychrometry
7: Psychrometric Processes and Charts
8: Heat and Moisture Exchange in Mine Airways
9: Human Thermoregulation and Physiological Responses
10: Heat Stress Indices and Guidelines
11: Mine Heat Sources - I
12: Mine Heat Sources - II
13: Strata Heat and Geothermic Gradients
14: Rock-to-Air Heat Transfer
15: Mine Climate Simulation and Heat Removal Capacity
16: Principles of Mine Refrigeration
17: Components in Mine Cooling System
18: Direct and Indirect Heat Exchangers in Mine Cooling
19: Mine Cooling System Design and Layouts
20: Specialized Mine Cooling Systems and Emerging Technologies
21: Continuity, Pressure and Energy in Mine Airways
22: Flow Regimes and Turbulence in Mine Airways
23: Frictional Pressure Drop and the Square Law
24: Pressure Loss in Airways - I
25: Pressure Loss in Airways - II
26: Series and Parallel Ventilation Network
27: Natural and Controlled Splitting of Airflow
28: Ventilation Control Devices and Leakage
29: Ventilation Networks and Direct Application of Kirchoff’s
30: Solution of Ventilation Networks By The Hardy Cross Method
31: Auxiliary Ventilation - Fans, Ducts and Leakage
32: Forcing, Exhausting and Overlap Auxiliary Ventilation
33: Auxiliary Ventilation Design Checks and Recirculation
34: Natural Ventilation Pressure in Mines
35: NVP from Thermodynamic Considerations
36: Mine Fans, Fan Pressure and Fan Classification
37: Basic Impeller Theory and Energy Transfer in Mine Fans
38: Fan Characteristic Curves, Performance, Stall and Efficiency
39: Fan-Mine Interaction and Operating Point
40: Fan Laws
41: Fan Duty Control and Operational Management
42: Fans in Series and Parallel
43: Main Fan Selection and Life-of-Mine Duty Planning
44: Fan Installation, Pressure Recovery and Field Performance
45: Integrated Fan-System Operation and Booster Fans
46: Air Velocity and Quantity Surveys
47: Pressure Quantity Surveys
48: Psychrometric and Climatic Surveys
49: Gas and Dust Surveys
50: Integrated Ventilation Survey and Model Calibration
51: Systems Analysis and Ventilation Planning Criteria
52: Coal Mine Ventilation Strategies
53: Metal Mine Ventilation Strategies
54: Steps in Design of a New Mine Ventilation System
55: Life-of-mine Ventilation Planning and Scenario Analysis
56: Ventilation Energy and Cost Analysis
57: Economic Sizing of Airways and Shafts
58: Ventilation-on-demand and Energy Optimization
59: Mine Fire Ventilation and Emergency Airflow Dynamics
60: Sealed Areas, Fire-Gas Interpretation, Re-entry